Hi Chris,
It works on my installed 2.5. I did make the mistake of trying to load it while my BP config with GladeVCP panel was running and it didn't like that at all
Seems the DRO section wastes some space that the back plot could use. Also the checkboxes are a PIA for me to use and radio buttons would be better if they are available for coolant on/off. I like the status bar on top too.
Additional things that are important for me to see are:
current coordinate system
offsets for G92 and coordinate system
current tool and tool offsets
Pretty darn neat!
I don't understand the link to axis at this point, but I'm sure I will in due time.
Thanks
John